▪ Agents
Distribution and agency
Regional exclusivity by class and territory, dealer certification and demo fund.
Discuss distribution▪ Partners Partnerships, offsets and technology transfer
In several of our markets the question is not whether the equipment works — it is whether it can be produced locally, under your control, with your engineers. Ukraine holds intergovernmental agreements that allow exactly that: technology transfer without assignment of intellectual property, with use and re-export control.
▪ 01 Five models
A production licence for defined SKUs in your jurisdiction. You manufacture; we supply documentation, test benches and engineer certification.
Best fit: national localisation targets
A shared entity with a local ownership share, satisfying offset and local-content requirements directly.
Best fit: GAMI, Tawazun, Barzan programmes
Our modules inside your platform or C2 architecture, with an interface specification and a compatibility matrix.
Best fit: prime contractors and integrators
Regional exclusivity by class and territory, dealer certification, demo fund and spares pool.
Best fit: established defence agents
Joint development against your requirement, with foreground and background IP split defined before work starts.
Best fit: sovereign capability programmes
▪ 02 What transfers and what does not
| Item | Licensing | Joint venture | OEM | R&D co-op |
|---|---|---|---|---|
| Assembly documentation | Yes | Yes | Partial | Yes |
| Test bench and QC methodology | Yes | Yes | Partial | Yes |
| Engineer certification | Yes | Yes | Yes | Yes |
| Firmware source | No | Escrow | No | Negotiated |
| RF design files | No | Negotiated | No | Foreground only |
| Right to export from your territory | Defined per agreement | Defined per agreement | No | Negotiated |
| Ownership of background IP | Stays in Ukraine | Stays in Ukraine | Stays in Ukraine | Stays with originator |
▪ 03 Localisation context by market
| Market | Authority | Target | Current | Route |
|---|---|---|---|---|
| Saudi Arabia | GAMI | 50% of military spend by 2030 | 24.89% (end-2024) | Licensing or JV |
| United Arab Emirates | Tawazun · EDGE Group | Offset obligations per contract | ~18% (2023) | JV or OEM into EDGE |
| Qatar | Barzan Holdings | Programme-specific | — | JV or licensing |
| Poland | PGZ · SAN programme | ~60% local content | In programme | OEM sub-supply |
| Australia | GWEO | Sovereign guided weapons capability | In programme | R&D co-operation |
| South Korea | DAPA | Domestic content requirements | In programme | Licensing |
▪ 04 How a partnership starts
Country, capabilities, existing contracts, offset obligations. Ten minutes, no NDA needed yet.
We come back with which of the five models fits, what transfers and what does not, and the legal basis.
Technical packages, localisation terms, royalty model and production requirements.
Terms, volumes and schedule are agreed in person. Nothing about this stage happens on a website.
▪ 05 What partners ask first
▪ 06 Partner profile
Tell us the country, the obligation you are working against and the capability you already have. We reply with an indicative model — which of the five fits, what transfers, and on what legal basis.
Step 1 of 2
Request a quote
Nothing is sent until step 2 is confirmed. Escape or the backdrop closes this and keeps your answers.
Step 2 of 2
What do you need?
Goes to export@blue-bird.tech. You receive a copy with a reference number.
Confirmation
Request sent
✓ Received
Ref BBT-2026-00473
A named specialist replies within one business day
A copy is already in your inbox at i.petrenko@bundeswehr.de, with the catalogue and the datasheet for Chuika 4.0 attached.
Need it faster? Book a 15-minute call with the same team.
Quote in 30 seconds
Reply within one business day
▪ Before you go
Up-to-date control and video bands of hostile airframes, refreshed weekly. A PDF to your inbox — no spam, only map updates.
By clicking you agree to the privacy policy.